Product Overview
Mining Standby Diesel Generator designed for crushing plants, underground ventilation systems, dewatering pumps, and remote mining facilities, featuring high-altitude cooling capability, heavy dust intake protection, and stable emergency power output during sudden high-impact industrial loading.
Technical Specifications
|
Item |
Specification |
|
Power Range |
100–3000kVA |
|
Rated Voltage |
400V / 415V / 480V / 690V |
|
Frequency |
50Hz / 60Hz |
|
Load Acceptance |
≥70% Instantaneous Loading |
|
Voltage Recovery Time |
≤1.5s |
|
Frequency Recovery Time |
≤3s |
|
Continuous Runtime |
24–48 Hours |
|
Fuel Consumption |
198–212g/kWh |
|
Ambient Temperature |
Up to 55°C |
|
Altitude Capability |
≤3000m |
|
Air Filtration |
Dual-Stage Heavy Dust Filter |
|
Cooling System |
High-Capacity Mining Radiator |
|
Fuel Tank Capacity |
500–5000L |
|
Protection Grade |
IP23 / IP44 |
|
Alternator Insulation |
H Class Vacuum Pressure Varnish |
|
Controller |
Deep Sea / ComAp |
|
Synchronization |
Multi-Unit Parallel Ready |
|
Remote Monitoring |
Satellite / 4G Optional |
Mining Load Recovery Technologies
High Load Acceptance Calibration
Turbocharger and fuel injection response tuned for ≥70% instantaneous mining load acceptance.
Fast Voltage Stabilization
AVR excitation system restores rated voltage within ≤1.5s after crusher motor startup.
Reinforced Frequency Recovery
Electronic governor reduces speed fluctuation during conveyor and pump cycling impact.
Anti-Wet Stacking Combustion Mapping
Low-load combustion calibration reduces carbon buildup during standby operation periods.
Heavy Dust & High-Temperature Protection
Dual-Stage Mining Air Filtration
Cyclone pre-cleaner removes coarse dust before secondary fine-particle filtration.
Positive Pressure Control Cabinet
Slight positive airflow inside the control cabinet reduces dust entry around electrical components.
Enlarged Radiator Core
45–55°C tropical radiator maintains stable coolant temperature during full-load mining operation.
Abrasion-Resistant Cooling Structure
Radiator fin spacing optimized to reduce blockage from fine mineral dust accumulation.
Remote Mining Operation Design
Extended Runtime Fuel System
500–5000L fuel tank supports 24–48h emergency operation without refueling.
Multi-Generator Parallel Expansion
Parallel synchronization supports phased mining equipment expansion.
Remote Fault Monitoring
Optional satellite and 4G modules transmit overload, shutdown, and fuel alarms from remote sites.
Reinforced Base Frame
10–12mm steel skid frame reduces deformation during heavy transport and rough terrain installation.
Factory Testing
Instantaneous Load Acceptance Test
Generator tested under sudden 70% mining load application.
High-Temperature Runtime Verification
Continuous operation completed under simulated 50°C cooling conditions.
Dust Filtration Inspection
Air intake restriction and filtration efficiency tested under mining dust simulation.
Parallel Synchronization Test
Load sharing and frequency balancing verified during multi-unit operation.
Optional Configurations
|
Optional Item |
Available Options |
|
Fuel Tank |
1000L / 3000L / 5000L |
|
Cooling System |
55°C Tropical Radiator |
|
Air Filtration |
Dual Mining Dust Filter |
|
Synchronization |
Automatic Parallel System |
|
Monitoring System |
Satellite / 4G Remote Monitoring |
|
Exhaust System |
Heavy-Duty Industrial Silencer |
|
Trailer Type |
Mining Off-Road Trailer |
|
Output Voltage |
690V Mining Configuration |
Maintenance Accessibility
External Dust Filter Access
Mining air filters replaceable without
canopy disassembly.
Enlarged Radiator Cleaning Space
Compressed-air cleaning clearance reserved for heavy dust maintenance.
Heavy-Duty Drain Valves
Oversized drain ports simplify oil servicing under field conditions.
Fault Event Recording
Controller stores overload, overspeed, overheating, and low-oil shutdown history.
FAQ
Hot Tags: mining standby diesel generator, China mining standby diesel generator manufacturers, suppliers, factory
